DN125 3m Length Concrete Pump Parts Twin Wall Pipe

Product Details
Customization: Available
Compound Material: Steel Chrome Composize Pipe
Material: St52 +Nm600
Gold Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
12000000 USD
Plant Area
>2000 square meters
  • DN125 3m Length Concrete Pump Parts Twin Wall Pipe
  • DN125 3m Length Concrete Pump Parts Twin Wall Pipe
  • DN125 3m Length Concrete Pump Parts Twin Wall Pipe
  • DN125 3m Length Concrete Pump Parts Twin Wall Pipe
  • DN125 3m Length Concrete Pump Parts Twin Wall Pipe
  • DN125 3m Length Concrete Pump Parts Twin Wall Pipe
Find Similar Products

Basic Info.

Model NO.
DN125 4.85mm (3.25m + 1.6mm)
Installation and Connection
Fully Automatic Water-Cooled Welding
Thickness
4.85mm
Wall Thickness
1.65+3.2mm
Length(in/mm)
118.12/3000 or Customized
Hardeness
up to 68HRC
Hardened Process
Induction Hardened
Theoretical Weight(Lbs/Kg)
106/48
Flange Tape
Sk148
Test Pressure
>170bar
Color
Red Black White or Customized
Surface Coating
Electrostatic Powder Coating
Transport Package
Standard Export Package
Specification
DN125/5" 4.85mm (3.25mm+1.6mm) 3000mm
Trademark
Ximai
Origin
China
HS Code
841391
Production Capacity
500PCS/Per Day

Product Description

DN125 3m Length Concrete Pump Parts Twin Wall Pipe
 
TWIN WALL BOOM PIPE DN125 4.85mm
Nominal Diameter DN125 
Wall Thickness 4.85mm (3.25mm+1.6mm)
Inner Wall 3.25mm
Outer Wall 1.6mm
Heat Treatment Induction Hardened
Weld-Ends SK
Length 3000mm
Working Pressure 85 bar
Hardness Up to 68 HRC
Surface coating Electrostatic Powder Coating
Color  Customized
Model No XMTW480

DN125 3m Length Concrete Pump Parts Twin Wall PipeDN125 3m Length Concrete Pump Parts Twin Wall PipeDN125 3m Length Concrete Pump Parts Twin Wall Pipe

DN125 3m Length Concrete Pump Parts Twin Wall Pipe

 

Twin wall boom pipes have an inner resistant pipe lining with an outer steel shell. The internal liner is made of special anti-wear steel, hardness up to HRC68. The induction hardening process and high-quality welding process ensure that pipes achieve a service life that is several times longer than common ST52 pipes with the same wall thickness.

Hebei Ximai Machinery has over 20 years of experience in boom pipes and other concrete pump parts production. Our production strictly follows the industry standard, such as the flange welding, induction hardening, rust removal and the surface coating (Electrostatic Powder Coating). The strict quality control ensure that we offer the best products and service to our clients. The Our pipes have been exported to all over the world, USA, Germany, Australian, South America, Southeast Asian and North Africa.

Contact Us: [email protected]

Inner surface induction hardening

DN125 3m Length Concrete Pump Parts Twin Wall Pipe

Electrostatic powder coating
DN125 3m Length Concrete Pump Parts Twin Wall Pipe


Pipes exported to all over the world
DN125 3m Length Concrete Pump Parts Twin Wall PipeDN125 3m Length Concrete Pump Parts Twin Wall Pipe
FAQ

Question : Is your company manufacturer or trade company?
Answer : Manufacturer.

Question : Is samples order available?
Answer : Yes.

Question : Is OEM or ODM available?
Answer :Yes.

Question : What is your production lead time?
Answer: 2~3 weeks.

 



DN125 3m Length Concrete Pump Parts Twin Wall Pipe

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier